Complete filling lines for application-specific production requirements.
Configured project enquiry. Final configuration, availability, freight and regional terms are confirmed in writing.
Published technical snapshot
Max. Air Consumption
4.5m 3 /min
Single-head filling volume
10-300ml
Applicable aerosol can diameter
35-66mm
Applicable aerosol can Height
70-330mm
Manufacturer-published values. Final configuration is confirmed for the project.
Applications
Suitable applications
Specification status
Technical detail can be confirmed on enquiry.
Key features
Complete filling lines for application-specific production requirements.
Technical configuration
Container compatibility
Applicable aerosol can diameter
35-66mm
Applicable aerosol can Height
70-330mm
Applicable aerosol can Opening Internal Diameter
1" ( 25.4mm )
Applicable aerosol can valve Size
1" ( 25.4mm )
BOV valve / bag compatibility
Applicable aerosol can valve Size
1" ( 25.4mm )
Utilities
Working Pressure
0.5-0.7MPa
Max. Air Consumption
4.5m 3 /min
Dimensions & weight
dimensions
1100 (L) ✖️930 (W) ✖️1870 (H) mm
Automation level
Specification status
Technical detail can be confirmed on enquiry.
Production capability
Production capability
Max. Air Consumption
4.5m 3 /min
production capacity
30-60cans/min
Optional configurations
Available configuration
Specification status
Technical detail can be confirmed on enquiry.
Support
Installation & commissioning
Project support
Installation and commissioning requirements can be reviewed during project scoping. Any coordination, site readiness, integration, travel and acceptance requirements are agreed for the selected project.
Operator training
Project support
Operator and technical-personnel training requirements can be discussed in relation to the agreed equipment configuration and operating requirements. Scope, delivery method and timing are confirmed for the selected project.
After-sales support
Local engineering support
Servicing, troubleshooting, preventative maintenance and spare-parts requirements can be discussed for the selected equipment. Availability, response timing and parts holdings are confirmed for each project; they are not represented as guaranteed stock.