Semi-automatic systems for application-specific production requirements.
Configured project enquiry. Final configuration, availability, freight and regional terms are confirmed in writing.
Published technical snapshot
Production capacity
10~20cans/min
Liquid filling volume
30~500 ml (can be customized))
Applicable can diameter
20~100 mm
Applicable can height
60~350 mm
Manufacturer-published values. Final configuration is confirmed for the project.
Applications
Suitable applications
Potential application category
Personal care
Potential application category
Household
Potential application category
Industrial
Potential application category
Pharmaceutical
Potential application category
Food & beverage
Key features
Semi-automatic systems for application-specific production requirements.
Technical configuration
Container compatibility
Applicable can diameter
20~100 mm
Applicable can height
60~350 mm
BOV valve / bag compatibility
Applicable valve
1'' (25.4 mm)
Utilities
Gas pressure
0.45~0.7Mpa
Dimensions & weight
Specification status
Technical detail can be confirmed on enquiry.
Automation level
Published automation wording
semi-automatic
Production capability
Production capability
Production capacity
10~20cans/min
Optional configurations
Available configuration
Liquid filling volume
30~500 ml (can be customized))
Support
Installation & commissioning
Project support
Installation and commissioning requirements can be reviewed during project scoping. Any coordination, site readiness, integration, travel and acceptance requirements are agreed for the selected project.
Operator training
Project support
Operator and technical-personnel training requirements can be discussed in relation to the agreed equipment configuration and operating requirements. Scope, delivery method and timing are confirmed for the selected project.
After-sales support
Local engineering support
Servicing, troubleshooting, preventative maintenance and spare-parts requirements can be discussed for the selected equipment. Availability, response timing and parts holdings are confirmed for each project; they are not represented as guaranteed stock.