Aerosol filling machines for application-specific production requirements.
Configured project enquiry. Final configuration, availability, freight and regional terms are confirmed in writing.
Published technical snapshot
Valve inserting speed
120cans/min
Motor total power
1.1 KW
Height of the conveyor belt
875±15mm
Max. Gas consumption
250L/min
Manufacturer-published values. Final configuration is confirmed for the project.
Applications
Suitable applications
Specification status
Technical detail can be confirmed on enquiry.
Key features
Aerosol filling machines for application-specific production requirements.
Technical configuration
Container compatibility
Specification status
Technical detail can be confirmed on enquiry.
BOV valve / bag compatibility
Valve inserting speed
120cans/min
Valve correcting head
4/set
Utilities
Motor total power
1.1 KW
Max. Gas consumption
250L/min
Motor Power
0.37KW
Max. Air consumption
250L/min
Dimensions & weight
Hopper dimension
780×600×340(mm)
Dimension
2300×780×2000(mm)
Dimensions
1400×1100×200(mm)
Automation level
Published automation wording
manual
Production capability
Production capability
Valve inserting speed
120cans/min
Max. Gas consumption
250L/min
Max. Turntable rotating speed
25times/min
Max. Air consumption
250L/min
Optional configurations
Available configuration
Specification status
Technical detail can be confirmed on enquiry.
Support
Installation & commissioning
Project support
Installation and commissioning requirements can be reviewed during project scoping. Any coordination, site readiness, integration, travel and acceptance requirements are agreed for the selected project.
Operator training
Project support
Operator and technical-personnel training requirements can be discussed in relation to the agreed equipment configuration and operating requirements. Scope, delivery method and timing are confirmed for the selected project.
After-sales support
Local engineering support
Servicing, troubleshooting, preventative maintenance and spare-parts requirements can be discussed for the selected equipment. Availability, response timing and parts holdings are confirmed for each project; they are not represented as guaranteed stock.