Bag-on-Valve filling equipment for a configured production process.
Configured project enquiry. Final configuration, availability, freight and regional terms are confirmed in writing.
Published technical snapshot
Gas filling capacity
800~1200cans/hr
Liquid filling capacity
600~800cans/hr
Applicable valve
1''(25.4mm)
Gas filling accuracy
≤±0.03MPa
Manufacturer-published values. Final configuration is confirmed for the project.
Applications
Suitable applications
Potential application category
Personal care
Potential application category
Pharmaceutical
Potential application category
Food & beverage
Key features
Bag-on-Valve filling equipment for a configured production process.
Technical configuration
Container compatibility
Specification status
Technical detail can be confirmed on enquiry.
BOV valve / bag compatibility
Applicable valve
1''(25.4mm)
Utilities
Specification status
Technical detail can be confirmed on enquiry.
Dimensions & weight
Specification status
Technical detail can be confirmed on enquiry.
Automation level
Specification status
Technical detail can be confirmed on enquiry.
Production capability
Production capability
Gas filling capacity
800~1200cans/hr
Liquid filling capacity
600~800cans/hr
Optional configurations
Available configuration
Specification status
Technical detail can be confirmed on enquiry.
Support
Installation & commissioning
Project support
Installation and commissioning requirements can be reviewed during project scoping. Any coordination, site readiness, integration, travel and acceptance requirements are agreed for the selected project.
Operator training
Project support
Operator and technical-personnel training requirements can be discussed in relation to the agreed equipment configuration and operating requirements. Scope, delivery method and timing are confirmed for the selected project.
After-sales support
Local engineering support
Servicing, troubleshooting, preventative maintenance and spare-parts requirements can be discussed for the selected equipment. Availability, response timing and parts holdings are confirmed for each project; they are not represented as guaranteed stock.