BOV Technology · Machinery · Engineering · Local SupportAustralia · New Zealand · Pacific
MEITAR OCEANIA / ENGINEERED EQUIPMENTAuxiliary machinery
Back to equipment
Auxiliary machinery

Water Bath Aerosol Equipment

Water Bath Leakage Testing (also known as the hot water bath test) is one of the most commonly used methods for detecting leaks in aerosol cans during production.

Configured project enquiryEquipment scope, configuration and commercial terms are confirmed for the selected project.
PUBLISHED TECHNICAL SNAPSHOTFull specification reference
Production capacity
60~90cans/min
Main transmission power
1.5KW
Electric heating power
40KW
Tank volume
2.0m 3

Australia, New Zealand and Pacific enquiries are welcome. Delivery, freight and commissioning requirements are confirmed for the project.

Applications

Water Bath Aerosol Equipment suits aerosol producers that need a post-fill, post-seal leak check before product moves onward. It is testing auxiliary equipment—not a filler, crimper or capper: filled, sealed cans are submerged in heated water so escaping gas forms visible bubbles at a leak. The manufacturer description says observation may be by operators or automatic detection systems, but it does not identify the automation supplied with this machine; confirm the selected detection and handling arrangement.

Potential application category
Industrial

Compare a related configuration

For a related configuration alternative, compare the Aerosol Leak Detection Machine. The manufacturer listing explicitly calls it a Manual Aerosol Water Bath Leakage Tester and says cans are manually placed and observed for bubbles; it cites 7 kW heating power. Water Bath Aerosol Equipment has the published 60–90 cans/min capacity and 40 kW heating figure. These pages document no adjacent model hierarchy, so neither should be represented as a next-level option.

Compare Aerosol Leak Detection Machine

Key features

Product-specific feature detail can be confirmed on enquiry.

Technical configuration

Manufacturer-published valuesProject scope agreed on enquiryMissing fields clearly identified

Published fields are retained from the imported manufacturer reference. Confirm the final configuration before order.

Container compatibility

Specification status
Technical detail can be confirmed on enquiry.

BOV valve / bag compatibility

Specification status
Technical detail can be confirmed on enquiry.

Utilities

Main transmission power
1.5KW
Electric heating power
40KW
Max. Gas consumption
0.6~1m 3 /min

Dimensions & weight

Specification status
Technical detail can be confirmed on enquiry.

Automation level

Published automation wording
automatic

Published specification reference

Imported source values are shown below without estimating missing specifications.

Production capacity
60~90cans/min
Main transmission power
1.5KW
Electric heating power
40KW
Tank volume
2.0m 3
Max. Gas consumption
0.6~1m 3 /min
Temperature control precision
55±2℃
Time
3~5min

Production capability

The manufacturer lists production capacity as 60–90 cans/min. That is a manufacturer-published range rather than a guaranteed or typical rate, and the manufacturer page gives no operating conditions or automation configuration for it, so it should be confirmed for the proposed line. The specification table also lists 40 kW electric heating power; it is a utility figure, not an output measure.

Production capacity
60~90cans/min
Max. Gas consumption
0.6~1m 3 /min

Optional configurations

Configuration options are confirmed for the selected product and operating requirements.

Specification status
Technical detail can be confirmed on enquiry.

Support

Support requirements can be discussed as part of the equipment project. Scope and availability are confirmed on enquiry.

Installation & commissioning

Project support
Installation and commissioning requirements can be reviewed during project scoping. Any coordination, site readiness, integration, travel and acceptance requirements are agreed for the selected project.

Operator training

Project support
Operator and technical-personnel training requirements can be discussed in relation to the agreed equipment configuration and operating requirements. Scope, delivery method and timing are confirmed for the selected project.

After-sales support

Local engineering support
Servicing, troubleshooting, preventative maintenance and spare-parts requirements can be discussed for the selected equipment. Availability, response timing and parts holdings are confirmed for each project; they are not represented as guaranteed stock.
Discuss This System

What are you looking to build?

From individual machinery to complete production capability, talk to Meitar Oceania about your product, application and production requirements.