Bag-on-Valve filling equipment for a configured production process.
Configured project enquiry. Final configuration, availability, freight and regional terms are confirmed in writing.
Published technical snapshot
Max. air consumption
8 ~ 12m3/min
Filling volume
30 ~700ml
Diameter of aerosol cans
35~66mm
Height of aerosol cans
90~260mm
Manufacturer-published values. Final configuration is confirmed for the project.
Applications
Suitable applications
Potential application category
Industrial
Potential application category
Pharmaceutical
Key features
Bag-on-Valve filling equipment for a configured production process.
Technical configuration
Container compatibility
Diameter of aerosol cans
35~66mm
Height of aerosol cans
90~260mm
Applicable aerosol valve
1''
BOV valve / bag compatibility
Applicable aerosol valve
1''
Utilities
Rated voltage
220V/50Hz
Rated power
1.0KW
Gas pressure
0.6 ~ 0.8MPa
Max. air consumption
8 ~ 12m3/min
Dimensions & weight
Specification status
Technical detail can be confirmed on enquiry.
Automation level
Specification status
Technical detail can be confirmed on enquiry.
Production capability
Production capability
Max. air consumption
8 ~ 12m3/min
Production capacity
70~90 cans/min
Optional configurations
Available configuration
Specification status
Technical detail can be confirmed on enquiry.
Support
Installation & commissioning
Project support
Installation and commissioning requirements can be reviewed during project scoping. Any coordination, site readiness, integration, travel and acceptance requirements are agreed for the selected project.
Operator training
Project support
Operator and technical-personnel training requirements can be discussed in relation to the agreed equipment configuration and operating requirements. Scope, delivery method and timing are confirmed for the selected project.
After-sales support
Local engineering support
Servicing, troubleshooting, preventative maintenance and spare-parts requirements can be discussed for the selected equipment. Availability, response timing and parts holdings are confirmed for each project; they are not represented as guaranteed stock.